Mqabba - Ex-quarry, Tax-Xaghri L-Imqalleb, Mqabba
To sanction removal of part-of fill from old quarry (the latter to be mostly used as recycled stone for the construction of rubble walls) and formation of underground link between old quarry and existing Plant approved by PA 5849/09. Application proposes the removal of the remaining fill (to be used as recycled stone for rubble walls), placing of mobile crusher to recycle general excavation clean-waste and refilling of old quarry with excess unrecyclable material over an estimated period of 20 years. Application also includes the placing of top-soil once quarry is backfilled, reconstruction of existing rubble boundary-walls and sanctioning of gate.
Category: Sanctioning (General)
Applicant: Andre Zahra
Architect: Perit Henry Attard