San Pawl il-Bahar - Mirabelle Flats, No. 10, Triq Emanuel Pinto, San Pawl il-Bahar
Renewal of PA447/18 (To sanction built outline at the back, proposed extension of existing penthouse to 3 one bedroom units and construction of an overlying receded floor and the correction of site from that approved in PA3701/92.)
Category: Sanctioning (Alterations/Extensions)
Applicant: Mr Paul Borg
Architect: Perit Stephen Farrugia