Birzebbuga - 15, Triq il-Profs. Anton Tabone, Birzebbuga
Proposed sanctioning of PV panels overhang at ground floor level, including the configuration of the site following survey. Proposed repositioning of PV panels at second floor, and removal of cladding on facade.
Category: Sanctioning (General)
Applicant: Mr Alexander Bonello
Architect: Perit Reuben Cauchi