Zejtun - 217, Anfield, Triq Toni Zahra, Zejtun
To sanction of a roof drying area structure on the second floor, along with a study and a small box storage on the ground floor, and the removal of existing solar panels. This proposal is based on the previous permit DN/2000/15.
Category: Sanctioning (General)
Applicant: Stephanie Gatt James
Architect: Perit Joseph Saliba